This Survey of a major road in Brisbane’s north was conducted on behalf of Council’s Design team who were investigating possible road and intersection upgrades.
Our initial task was to put in place a first order ‘primary’ control prior to undertaking Surveys on site. This Control was increased throughout the extents and adjusted to Primary Control to form an accurate network for our Surveys and as a solid basis for later Construction Set Out Surveys.
The capture was to BCC’s rigorous survey specifications. A review of the Survey by Council later confirm that the data supplied meet requirements well above expectations.
This major road project reconfirmed JFP’s Surveyors ability to work safely in dangerous environments using Safe Work Methods in accordance with our Workplace Health & Safety policy.